Export
The IN export process is the second capacity calculation process aimed at assessing the value of the Italian export. It is run both two days before real-time operations (D2CC) and the day before real-time operations (IDCC).
The table below shows the typical timing of these processes (these timings are provided as an example of GridCapa task scheduling and may be adjusted as needed):
| Process | Time window | Launch mode | Number of timestamps |
|---|---|---|---|
| IN Export D2CC | 19:00 - 02:00 (Europe/Brussels time) | Automatic | 8 timestamps (00:30, 03:30, 07:30, 10:30, 13:30, 16:30, 19:30, 22:30) |
| IN Export IDCC | 03:00 - 06:00 (Europe/Brussels time) | Automatic | 4 timestamps (13:30, 16:30, 19:30, 22:30) |