Skip to main content

Import EC

The Import EC process is the main capacity calculation process aimed at determining the Maximum Northern Italian Import (MNII). It is run both two days before real-time operations (D2CC) and the day before real-time operations (IDCC).

The table below shows the typical timing of these processes (these timings are provided as an example of GridCapa task scheduling and may be adjusted as needed):

ProcessTime windowLaunch modeNumber of timestamps
IN Import EC D2CC18:30 - 01:30 (Europe/Brussels time)Manual8 timestamps (00:30, 03:30, 07:30, 10:30, 13:30, 16:30, 19:30, 22:30)
IN Import EC IDCC run 1N/AN/AProcess on hold
IN Import EC IDCC run 202:30 - 05:30 (Europe/Brussels time)Manual4 timestamps (13:30, 16:30, 19:30, 22:30)